35 STORY Site Erected Knockdown Cooling Section     NO CRANE!!                           Solution Oriented Design and Execution.

Toronto Area Roof Top Installation of Cooling Coil Section.

Another 35 story building. There was no crane access and a helicopter lift was cost prohibitive for the end user and contractor. The entire unit was designed to utilize the passenger elevator then stairways to the rooftop. This unit is a 15,000 CFM Cooling Coil and plenum section  to add cooling to an existing AHU on site.

20150707 110417
20150707 110429
20150708 111217
20150708 111231
20150708 111249
20150708 111300
20150708 111405


© AWSI 2015