35 STORY Site Erected Knockdown Unit, NO CRANE! Solution Oriented Design and Execution.

Toronto Area Gas Fired AHU, full unit:

Here the unit was installed a top a 35 story building. There was no crane access and a helicopter lift was cost prohibitive for the end user and contractor. The entire unit was designed to utilize the passenger elevator then stairways to the rooftop. This is a complete GAS FIRED Air Handling Unit assembled on site. Pictures below show the stages through out the process.