This unit was a dual wheel DOAS unit for low humidity applications with chilled beams. The units were oversized to reduce static pressure in the system. They incorporated multi-wheel fan arrays, heat recovery, and passive dehumidification. The units were R-22 3” foam insulation, fully thermal break construction, and all aluminum cladding to reduce weight and extend the life of the AHU.
The units were third party independently tested and passed at both 12” at 0.5% leakage and 14” at 1% leakage without reversing, blanking, or taping the doors.
Client: Sheridan College Location: Brampton, Ontario
Final Assembled Units On Site
Unit Lifting